Manta Pacific calls itself modular, which is another way of saying it depends on two other chains to survive. Polygon zkEVM plus Celestia DA means any PQC migration has to happen twice, in two governance forums that have never had to agree on crypto.
Summary
Manta Pacific is a modular L2 combining Polygon zkEVM + Celestia DA, mainnet Sept 2023. Standard pairing-based PLONK + Ed25519 DA stack, all Shor-breakable. No PQC activity. Migration is structurally complex due to Polygon zkEVM + Celestia dual dependencies. Band 1 Unaware.
What the gates say
- Hybrid: FAIL. No hybrid plan on file.
- Evidence: PASS. Sources reconstructable by third party.
- Primitive naming: PASS. Named primitives at every scored sub-level.
Burn-vs-rescue policy on file
undeclared
Seven dimensions
Each dimension scores 0-100 internally; the weighted roll-up produces the QRI on the left. Open a row to read the sub-score detail.
1 Cryptographic Exposure 22 / 100
Polygon zkEVM + Celestia DA stack. Manta Atlantic (zk privacy on Polkadot) is a separate chain.
ECDSA secp256k1 (inherited from Ethereum) · Polygon zkEVM PLONK over BN254 (pairing-based) · Celestia DA signatures (Ed25519) · Keccak-256No PQC families deployed
No NIST PQC primitives deployed
2 HNDL Exposure 10 / 100
EOA ECDSA inherited from Ethereum. Mainnet ~18 months. Modest TVL.
Limited cold-key horizon.
ECDSA + PLONK-KZG both Shor-breakable. Celestia Ed25519 also breakable.
Standard TLS. No PQC KEM.
3 Metadata & Privacy Exposure 22 / 100
Pseudonymous EVM transparency.
Centralized Manta sequencer. Celestia nodes + RPC providers.
ETH<->Manta bridge + Celestia DA correlation.
Non-private by design (Manta Pacific vs Manta Atlantic privacy chain).
4 Migration Architecture 30 / 100
Polygon zkEVM-based — upgrade path depends on Polygon governance. Dual-layer complexity (DA + settlement).
Inherits ERC-4337 from Ethereum. Manta Atlantic uses zkSBTs.
Multiple Manta Pacific upgrades since Sept 2023. Celestia DA integration.
No hybrid PQC plan. Depends on Polygon zkEVM + Ethereum roadmap.
5 Deployment Execution 0 / 100
no public artifact found
no public artifact found
no public artifact found
no public artifact found
No PQC announcements.
6 Supply Chain Vendor Readiness 6 / 100
7 Governance & Coordination 25 / 100
Centralized sequencer + Celestia DA.
Mainnet upgrades since 2023. Celestia integration coordinated.
Manta Network team (Kenny Li, Victor Ji). No named PQC lead.
Launch + bridge incident handling (Manta Atlantic).
The X + Y vs Z inequality
X (data shelf life): 4-8 (young L2)
Y (migration time): 10-15 (dual-layer complexity — Polygon + Celestia)
Z10 (10% CRQC year): 2036 · Z50 (50%): 2041
Verdict: X+Y > Z (danger).
Four-scenario grid
| Scenario | Value preserved | Privacy preserved |
|---|---|---|
| quantum never | 100% | 100% |
| arrives suddenly pre migration | 10% | 15% |
| arrives slowly post migration | 75% | 65% |
| arrives slowly mid migration | 30% | 25% |
Peers in the rollup-L2 profile
Order-book view of the 9 chains closest to Manta Pacific by QRI.
Public artifacts used for this scorecard
Each entry below is a sub-score citation. Clicking the link takes you to the public source. A third party should be able to reconstruct every number on this page from these URLs in 48 hours.
Polygon zkEVM + Celestia DA stack. Manta Atlantic (zk privacy on Polkadot) is a separate chain.
Supply chain snapshot
A chain's supply chain cannot migrate faster than its slowest dependency. Zero PQC roadmaps in any of the four categories is a structural blocker, not a lagging indicator.
Analyst notes on the scoring
Dual-layer architecture (settlement + DA) doubles PQC coordination surface. Manta Atlantic (separate zk-privacy chain on Polkadot) would score differently but is out of scope here.
Scorecard metadata
- Profile: rollup-L2
- Scored: 2026-04-18 by
layerqu-v2-scoring-agent-3 - v1 reference:
chainscreen-v1-archive - QRI raw: 11 · after caps: 11
- Confidence interval: ±13
- PQC washing ratio: 1x
- Burn-vs-rescue: undeclared
Caps triggered
- Mosca (5a<20% → QRI max 60)
- Sutor (5d=0 → Migration Stage max 2)
- Preskill (several dims <3 artifacts × 0.5)
- Casado (4 vendor tiles pqc=0 → migration_stage max 3)
- Hybrid gate FAIL → QRI cap 60